Date edits
Date information is added in 2 places in Sierra, amend both.
008
To open the 008 field, click in the field and press ctrl+r For single dates edit the Date One field on the right. Single approximate (or circa) dates can be included.
Full details are in the Fixed Fields 008 instructions
260/264
The date is also added to subfield c of 260/264. Legacy records will have field 260, newer records will have 264.
Dates that are have been taken from sources other than the object itself should be included in square brackets.
Approximate dates can be included, recognised formats are:
Full details are in the Bibliographic Date instructions
Last updated